Phase 2 Complete!

Came home tonight and noticed that part of the footpath (near to where the fiber pair are located at our property boundary) had been dug up.

Maybe they had done the tunneling and fiber pipe/conduit installation already?


They had talked about potentially doing an open-trench installation (ie they had the option of digging a ditch/trench all the way to the house), but there didn't appear to be anything visible.

Going through the gate and to the point near the house where the outside box will be placed confirmed that they had completed the installation of the "pipe" and would now be able to place an optical fiber down it to connect us up next Tuesday.

Congratulation Enable Networks / Downer Engineering (or whomever actually does the installation of this part). A very nice, tidy job totally well done 8-).